On September 22nd, the Jordan Cove Energy Project (“Jordan Cove”) and Pacific Connector Gas Pipeline (“Pacific Connector”) filed applications with the United States Federal Energy Regulatory Commission (“FERC”) for the construction and operation of a 7.8 million tonne per annum liquefied natural gas (“LNG”) export terminal in Coos Bay, Oregon and the related Pacific Connector that will transport natural gas from the Malin Hub in southern Oregon to the LNG export terminal. Join us for an update on the entire project when Michael Hinrichs, Director of Communications for the Jordan Cove project provides an overview on Monday, November 13th, 11:30 AM at the DoubleTree by Hilton. This will be the last energy briefing of 2017 and we wish to thank series sponsor, WBS Coatings for their underwriting support. Reservations for this event are required and can be made by calling (970) 242-3214 or by clicking HERE. Cost is $15 in advance or $20 at the door, which includes lunch.

Click here to download full version of the Grand Junction Area Chamber of Commerce November 2017 Newsletter

360 Grand Avenue | Grand Junction, Colorado | (970) 242-3214
Email Us


WebmailPrivacy StatementMedia
© 2015- All Rights Reserved. Grand Junction Chamber of Commerce